Looking for suggestions on how to characterize the strength of unconsolidated, dry or moist spoil. The proposal is to construct a cut slope in a previously strip-mined area. The area was reclaimed with cast (loose) spoil. In-place density testing indicates the spoil is between 80-90% MDD...