Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: GeoPerson
  • Content: Threads
  • Order by date
  1. GeoPerson

    Excavation Support û Secant Wall

    I have two jobs that required shoring and sheeting. The 1st job is along the river and requires a 20 feet of excavations. The sheeting system will have to penetrate through till (N>50). The preliminary analysis shows that the minimum length of sheeting is 32. At 30 feet mudstone bedrock is...

Part and Inventory Search