What is the opinion of substution of reinforcement bars for a reinforced concrete beam. The drawings call for 2 - 25M and 3 - 25M bottom bars, and the contractor wants to substitute one 25M bar (500mm2)with 3 - 15M bars(600mm2). There are the obvious issues of sufficient clearance for concrete...
I have a building with a standing seam metal roof in an area with a high snow load. The standing seam roof has been installed with snow guards to prevent snow from sliding down the roof. This snow guard is fastened to the standing seam which in turn creates a shear load on that standing seam...
What is the rule of thumb of how many threads on the bolt should be past the face of the nut in bolted connections for steel framing?
I found the answer once some time ago and misplaced that tibbit.
Thanks in advance.
I have question about choosing the correct dow hi load insulation. Insulation is required under a mat foundation for a unheated warehouse to minimize frost penetration in northern Canada.
The question is in choosing the correct type of insulation, hi -40, hi-60 or hi-100 for the warehouse...
I need some assitance in determining the values for moment connection designs. We have to provide the value of the moment connection at the joints that are fixed in a rigid frame for the steel fabricator to do the MC design. I used P-Frame Lite to complete the rigid frame analysis and have all...
I think its time for an updated discussion on what's available for structural engineering software. I did some thread searches that went back to 2000 and 2001 and there is nothing current.
Our firm is looking to update its software, we currently use TEDDS, The Calculation Pad for Professional...
Can anybody point me to some literature on the design of concrete piles caps to steel piles? Anything available on the web? I have some steel driven piles installed for a gas bar canopy (substituted for a franki / compacto piles)and asked for the contractor to have the pile installer verify...
I would like justification to determine the location of a pour joint for a concrete beam and wall. The wall is approximately 2.0 meters high supported on piles, which is designed both as a retaining wall (elevation differnce between finihsed slab and outside grading )and beam to support the...
I have received the test results for a seven day break at 11.3 MPa. The design strength is 25 MPa. Based on the seven day break being 65% of max strength, the 28 day break should be 17.4 MPa.
The low concrete is for a canopy pad (with pedestal above) for a gas retail site.
I have proven...
I am doing a design that involves the modification to an exsisting wood glulam beam in a canopy (3 spans, 2 continious & 1 cantilever). The column supports are being moved to new locations, thus the continious spans are increasing and the cantilever span is decreasing, so the glulam has to be...
I am in the process of designing a foundation for a carwash with strip footing for a client. The carwash pit is approximately 3.0m deep and the footing is 1.6 to be below frost. They have a standard detail that shows a sloped footing going from 1.6 m down to the footing of the pit. This is...
I have some piles that were to be placed with a fc' value of 27.5 MPa. The actual concrete breaks came in at 19.0 MPa.
The axial loads are 262 kN bearing on a 760 x 760 plate, so crushing is not an issue. The anchor bolts are 1000mm long. Are there any other concerns that I have to be aware of...
Could someone clarify a comment given in a soils report about the factor of safety? A soils report gives cast-in-place pile a allowable bearing capacity is in undisturbed silt till of 360 kPa. Later in the report it states that "normally a factor of safety of 3 should be allowed in...
I have a series of W steel beams that are pin connected. 30 feet - 64 feet - 30 feet. As steel beams are manufactured in 60 foot lengths, how do I determie my inflection (splice) points in the 64 foot section?
I am doing a strip footing design for a high load buildig structure is soils with very low soil bearing pressure. This new building is an add on to an existing building also with a strip footing. The original soils report only recommends either driven timber or steel piles and I can not do...
I am doing a bell pile design for a structure with high loads and low skin friction values. When designing the bell pile, do I have to account for the weight of the soil above the bell area as additional pressure (load) acting on the soil below the bottom of the bell. P(factored) + S(weight) +...