System 11KV 50KA 3Sec; 60MVA 132/11KV transformer; Exsiting 11KV load 7.9MW, Motor 11KV,2950MW,2990rmn, LFA=6.2In, power factor 20%, locked torque =0.47TN, whether and how long the motor could be started?
CLient requires us to design the CP system with deepwell groundbed for one 24'' underground pipeline with 39km long and 3PE coating. The project location is in African desert with very high gound level soil resistivity of aroud 500 ohm(7.5m deep).
As my understanding, we have to drill a test...
CLient requires us to design the CP system with deepwell groundbed for one 24'' underground pipeline with 39km long and 3PE coating. The project location is in African desert with very high gound level soil resistivity of aroud 500 ohm(7.5m deep).
As my understanding, we have to drill a test...
The Client Specification requires that laboratory test of Resistance to Abrasion (the loss of weight that shall not exceed 10 mg/1000 turns) be applied to 3PE coating for 24'' pipline.
Is the above test a regular practice because it sounds strange to me? The pipeline is normal underground ...
Could anyone help me know what International or Industy Standard should be applied for FBE coating in terms of shop application and testing? 400um FBE coating is specified for underground bends in our Libya project.
Thanks.
David
Water Injection pipeline about 8 km
Design Pressure 139 Bar, above ground.
Solar radiation temp 95 c.degree, design temp 75 c.degree.
Peoject Spec for Line pipe, APL 5L X52 PSL 2, WT 17.5mm. 3PE coating.
However, only APL 5L X52 PSL 1 is market available. Could PSL 1 be alternative to PLS 2...