We have a problem in pipe pressure testing,
We are able to conduct the pipeline pressure test using air instead of water to the same requirements as expressed in desired standard in certain condition. But my question is, would we need to modify the line parts or consider any thing for this...
Dear friends,
which items i should consider during inspection over pipe fittings and check?
what are the main items of check list that i should consider?
thanks a lot
Dear friends,
It would be highly appreciated if help me to find a specification about "Reinforced Ground Water Reservoir", any e file or useful internet site...
thanks a lot