The contractor wants to wrap the PVC (4" sch 40 pipe w/sch 40 fittings) at the point of concrete thrust block contact. His reasoning is to prevent abraision at the point of contact. As an inspector, I see that since the wrap that is composed of 10 mil visqueen, with several wraps it becomes...