Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: mechpiper
  • Content: Threads
  • Order by date
  1. mechpiper

    Branch connection at Tee

    We have a existing 36"NB LNG header and as part of the modifications to the pipework we need to have 16" branch connection on this line. Due to the layout constraints only possible location to have the bracnh is at a butt welded Tee.(See sketch attached). I am trying to find the code requirement...
  2. mechpiper

    Base plate for vertical vessel

    For vertical vessels with skirts, the bottom base plate is single for short vessels say 1m or 2m in height. however for tall vessels 2 ring plates with gussets are used. Any suggestions on the significance and guidance on when 2 ring plates are required ? thanks and regards
  3. mechpiper

    Nozzle on Blind Flg

    I have a Nozzle on a blind flg. The blind fails for the Nozzle opening (for a revised design pressure, PD5500) and the Nozzle thickness cannot be increased as it is already ordered. The design is as per PD5500. One option is using reinforcement pads. has anyone come across pads on blinds? Is...
  4. mechpiper

    Process Plants overview

    Can someone suggest some online material to get an overview of the oil and gas plants...say from exploration to refining. thanks

Part and Inventory Search