    Color of GT inlet duct : impact on performance on hot summer days ?

    Dear all, my colleagues and myself are in charge of detailed engineering a gas turbine project. The gas turbine will be located oudoor, in a hot and sunny region. A this stage of the project, we will have to specify the painting color expected on the inlet and filtration duct. Based on...
  2. alcor30

    Anti-icing protection of gas turbine during startup transients

    Dear all, We are about to commission a gas turbine in a northern Europe area. The site is exposed to low temperatures and high humidity, so that icing phenomenas may occur in the gas turbine air intake. The gas turbine core engine is protected from icing by hot air injection bleeded from the...
  3. alcor30

    Gas performance heater of a combustion turbine - Design issue

    Dear all, my colleagues and myself are working on the design of a combined cycle powerplant. It is a repowering project. The gas turbine is a state-of-the-art model but the bottoming cycle will re-utilize existing equipments inherited from an older thermal power station from the 70's (steam...
  4. alcor30

    Anti-icing protection of gas turbine air inlet

    Dear all, we are planning to install a mid-power gas turbine for a so-called cycling daily "start and stop" operation. The power plant will be located in a south-european region, in a rather mild and hot climate, close to the mediterranean sea shores. The air inlet duct of this GT will be...