Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: hunter82
  • Content: Threads
  • Order by date
  1. hunter82

    water well turbidity

    I have a water well that was recently drilled. The initial tests indicate that the water had a turbidity of 7. The well pumped several million gallons into the distribution system and the utility started getting complaints that the water was cloudy. We checked the turbidity agian and it was...
  2. hunter82

    stormwater pipe sizing

    I have a 5 acre watershed, 7 minute time of concentration, 8.5 inch per hour storm intensity, and .5% slope for my pipe. The flow out of the watershed into the pipe indicates that I need a 36 inch diameter pipe. I feel I have followed standard design procedures but a rainfall of 8.5 inches...
  3. hunter82

    Hydraflow hydrographs problem

    I am new to Hydraflow and I wanted to check everything that I have been working on. Hydraflow is giving me a time to peak discharge of around 13 hours, but by hand calculations I get a time to peak discharge of 1.5 hours. My time of concentration is 78 minutes-maybe I am wrong here but I...
  4. hunter82

    hec hms riser pipe

    I am attempting to model a riser pipe in Hec-Hms. I know that at the beginning stages of the pipe flowing, it functions like a weir, with the circumferece of the pipe equal to the length of the weir, but as the water level increases the riser pipe begins to flow full and it is modeled like an...

Part and Inventory Search