In thread408-48267 on 10Mar03, davefitz (Mechanical) posted a comment stating,"double block and bleed is required by code in section I (boiler) service if there are 2 or more boilers interconnected on a common steam line and the boilers have a manway in the steam drum. This is to avoid cooking...