I am working on a high pressure dense phase CO2 pipeline.
I am a recent graduate in chemical engineering and have not sized a PSV before. My company has a sizing spreedsheet, but I wanted to make sure I am addressing everything that needs to be addressed. This is the reason for posting to this...