My refinery has always done this in the past but I'm not sure it is necessary (small bore piping <2" and service with H2S >50 ppm in water phase). Would it be sufficient to maintain a preheat of ~200 degF, use E7018 low hydrogen electrodes, and follow up with a PT 48 hours after welding...