If I am putting together a box that contains a 3phase 20A breaker, and two connectors (one female, one male with a 1 meter cord attached), delivery is England. Will it require certification? Essentially its a feeder breaker that is going in the middle between and existing panel feed (32A) and a...
I'm looking for a source on those stab terminals you find on consumer electronics...molded into the plastics, so you then plug into an outlet. I need the stabs and ground pin, loose, so they can be part of an injected molded assembly. Anyone know of where I can get some?
First off...back from a bit of..being too busy to read the groups (hate it when that happens), and not sure if this is the right group but im sure I will be pointed off to the correct one if this isnt...but there are a bunch of smart folks here.
Now that winter is over, I was turning off my...