Can anyone tell me or point to a white paper that explains when you should spend the extra money for a reactive load bank? What is the chance you will test the genset using a resistive load bank and when you need to start large, (4160v 800hp), motors it fail, etc?
I am working on an upgrade to sync 3 generators 2000kw each to an incoming utility with 4 feeders 4160v, the current system is not sync'd, and I want to use the utility instead of loadbanks for testing, can anyone tell me what will be needed?
I get a run time error when I start AutoCAD using its own startup shortcut, but I can open a drawing using Windows Explorer, what does Windows Explorer do that AutoCAD does not, that allows me to start AutoCAD like this, and how do I fix it, can anyone help?
Can anyone explain why a soft start controller would cause a motor to jerk on startup. We had the manufacturer of the motor test the power and noticed the amps go up to 3000A, and the sinewave amplitude rise above and fall zero as a whole.