I'm new to the HVAC business and I'm a bit curious as I'm looking over some drawings I just sent out and noticed some lighting conflicts (only 4" of clearance for some flourescent lights)
How do these types of issues get resolved?
I am working on a combination office/lab building. In the performance specs it says to provide a CAV air handler with carbon filter, and all the other regular stuff (water coils, economizer, etc.) for the lab space. It also says to provide the office space with a VAV air hanlder with regular...
How far does a 400 kW with a 300 gallon belly tank of No 2. diesel generator have to be from a building?
Looking in NFPA and it's rather convoluted.
THANKS