I am looking at the design of settlement ponds for the removal of Silt, clay and sand particals from surface water collocted from the floor of an open cast limestone quarry.
How can i determine the amount of these particals in the water.
Hi all,
I am collecting all "rules of thumb" examples in engineering used to either design or give a design a quick sanity check. Could you please e-mail any that you use or know of to me. If you know the origin or explanation (maths) behind it, I would appreaciate it.
I think it is...
Hi all,
I am collecting all "rules of thumb" examples in engineering used to either design or give a design a quick sanity check. Could you please e-mail any that you use or know of to me. If you know the origin or explanation (maths) behind it, I would appreaciate it.
I think it is...
In the design of a under ground square RC tank for retaining water, what is a quick and easy way to calculate the moments in the tank base slab. The base is continuous between the four walls which are fully fixed to the base on all four sides.