Dear all,
I am working on a gas plant and for the first time I have seen an air cooler installed in the HP Flare Header, upstream of the KO Drum. This is in the P&IDs, not in the actual plant. Is this normal, and what it is more important, it is allowable?
The relieving fluids will be very...
Hi everyone,
I always design a vessel with segregated level bridles, one for controls and the other one for the trips. Is there any API Std where this is mentioned? I am trying to find a reference other than me saying this is the way to do it.
Thanks
Hi everybody,
In a hypochlorite disengagement tank, it is stated in a NORSOK standard that the minimum residence time for the hydrogen to disengage from the water stream is 20 minutes an normal operating conditions.
I am trying to demonstrate the minimum residence time by using Fick's Law of...