Dear All:
Another problem:
As a result of the damaged s/s, we did rewired our system to accomodate injection of 4 rented 480V gensets to our existing switchgears. Our existing system has 4-4160v feeders from s/s supplying 4 low voltage switchgears through 2mva xformers (1 for each feeder. Each...
Dear all,