I am trying to find the calculation to figure out the minimum embedment needed. A project of ours has had the foundations poured and the GC noticed that all the Anchorbolts are extending anywhere from 5-1/2" to 8-1/2" above finished grade when only 3" was specified. All Bolts were suppose to...