  1. sohaila7

    Issues with miscibility of two transformer oils

    Hello We have two types of tranformers from China. One is 150MVA and the other one is 10MVA. We are not sure of the type of oil used in these transformers. Are there any miscibility tests that we can do before buying oil from local market? What precautions need to be taken? Which standards...
  2. sohaila7

    Knowing what is underneath

    Is there any technology which can be used to survey an open land to ascertain if there are any cable underneath it? If there is any, is it cheap and easily available? These cables may be live or dead.
  3. sohaila7

    Loose Netutral

    The following incidence has happened: It was reproted that few split airconditioners (single phase) and some other (single phase) connected load got their power supply modules and control cards burnt. These loads were fed from a three phase supply (3 phase + Neutral). The items that burnt...
  4. sohaila7

    Generator sizing for high voltage motor loads

    Hello everyone I have to estimate a generator size for motors whichv are of two differnent operating voltages - 380V and 6.6kV. 380V motors range from 1HP to 332 HP. 6.6kV motors range from 350 HP to 6800 HP. The name plates of most motors have gone vague. Moreover, these motors are...