I have installed two 1"1/2 poly water lines complete with inserts to maintain the waterlines in the center of the carrier pipe.The 8" steel carrier pipe crosses a 60'bridge.The carrrier pipe was filled with foam.
I live in Vancouver British Columbia where the tempature does not fall to -10c...