Hello,
Was asked by a colleague (another structural engineer) to determine the allowable capacity of a concrete pile.
Data from geotechnical report is used to calculate allowable capacity at base of pile. Shouldn't the net carrying capacity at top of pile subtract the weight of the concrete...