Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: mrnico
  • Content: Threads
  • Order by date
  1. mrnico

    Analysis of existing billboards...

    I have been asked to analyze two existing billboards which were disassembled. Now, the owner wants to put them back up and wants me to tell him they will be safe. They are to go end-to-end for a total sign area of about 12' x 40'. Each section is to be supported by a single pole, tapering...
  2. mrnico

    New conc floor slab on existing outdoor slab fro metal bldg

    We are putting up a 40x60 steel Mueller building on an existing outdoor slab 4"+ thick which was poured in the 1950s with no reinforcement. We are looking at doing a 24x24x24" footing at each of the six column feet with a rebar basket in it. The new slab will be 3000psi, 6" thick with #4 bars...
  3. mrnico

    septic tank sizing/flows

    The local state enviro office is hassling us over the design flows for a small septic system we need at a local park. The bathroom will have 1 toilet/1 urinal/1 sink in the men's side ans 2 toilets/1 sink in the women's, plus a floor sink for the janitor. She (state) is asking for volume...

Part and Inventory Search