I have a general type question for you dredgers out there.
The plant I work at has about 75 km of tailings and hydrotransport pipelines 24"/26"/28" diameter. We convey oilsand slurry or the same slurry withthe oil removed (tailings). The material has a d50 of about 150 to 200...