Just got brought into a project team for topside facilities upgrade for subsea well. Been doing drilling engineering for last 10 yrs and am quite rusty on facilities.
I was looking over some drawings of the flowline boarding the platform (5" w/ 3.5" ID.)and noticed that the 4" boarding valve...