My company has a Bosch (FLM-4080) vial filler. We are looking for a engineering firm or contractor(s) that can support us in commissioning and "bug fixing".
The line is built, installed, and a most of the commissioning is complete. We're in the "final 10%" of the commissioning and need...
I have a vial washing machine that uses hot water spray. Vials go in and out of the machine through "mouse holes". The aerosol laden and ~ 100F/100%RH excapes into the class 10K zone --> not good. This was not considered in the room/equip design.
I cannot ventilate normally with ducted...
I'm working on a project to evaluate the best way to sequence loads for power outages in a pharmaceutical production facility.
We have:
Two independent main feeds from the power company @ 13.8 KV
"Tie Breaker" switchgear that switches all power to the active feed upon loss of one.
Step down...