  1. mufasa1

    Welding API 5L X70 Pipe to St-52 (S355JR) Pipe

    The penstock pipe for the hydroelectric power plant is 2400mm in diameter and the thicness varies from 12mm to 30mm, total head ise 288mt. The pipe material was selected as St-52 (S355JR). As we had hard time to find the 26 and 30mm thickness pipe in the local market. We decide to switch to API...
  2. mufasa1

    CO2 Reinjection for PH Modification

    Gentlemen, At our small geothermal power plant we have been trying to mitigate the metal silicate scaling occurring at the brine pipelines from the Wellhead Separator to the ORC Binary Power Plant. According to the initial calculations 6,6% of the NCG gas thrown from the top of the PP (96% of...
  3. mufasa1

    Flow in a branch line

    Gentlemen, There is a 20" main pipe. The fluid velocity in the pipe is 1 mt/sec. Assume that we take a perpendicular 1" branch line from the main pipe, and then tie it back to the main line a few meters ahead. The material will be the same. Please see the attached link for simple scheme...
  4. mufasa1

    Coil Tube Material for geothermal well. Dublex or Incoloy?

    Gentlemen, We are drilling geothermal wells on a reservoir where the geothermal fluid is saline, has similar Na and Cl concentrations as seawater. Here, I am trying to select the proper material for coil capillary tubes which we use to inject anti scaling chemicals downhole. I have received...
  5. mufasa1

    Material Selection for Geothermal Brine

    Dear All, What kind of material would you suggest for a geothermal brine which has TDS (57000) and Cl (44140) concentrations? Ph of the brine is 7.5. On the other hand it is also rich in Ca, K and Mg. Well temperature is 174 Cdeg. Surface temperature is around 150 Cdeg. I have reviewed some...
  6. mufasa1

    Separator & Accumulator

    Gentlemen, I already posted this thread at the Boiler and Pressure Vessels forum. I just saw that there is also a geothermal forum. For that reason excuse me for posting it twice. I am working as a project engineer at a Geothermal Power Plant Project. On the geothermal wellhead there will be a...
  7. mufasa1

    Aluminum Geodesic Dome Panel Attachment

    Gentlemen, API650 Appendix G - G.3.2 Aluminum Panels says as follows: "Attachment fasteners shall not penetrate both the panel and the flange of the structural member." Manufacturers are using either lapped joint or battened joint panel attachment system. At battened joint there is no...
  8. mufasa1

    Automatic Blowdown Control System for High Pressure Boiler

    Gentlemen, Our boiler specification is as follows: 350 ton/hour, 134 kg/cm2, 540 Cdeg, Single Drum, Natural Circulation, Top Supported, Oil Firing, C.E. Box Type We control our blowdown manually based on our daily lab results of the dissolved solids in boiler water. According to specification...
  9. mufasa1

    Different sizes on a single pipeline

    Dear All, At the moment I am working on a project which is about modernisation of an existing 2100 mt cement pipeline that feeds the water treatment plant of our petrochemical complex with fresh water. We are going to replace the existing line with 1400 mm (t=12 mm) diameter steel pipe. In our...
  10. mufasa1

    Flow induced errosion at Tee Branch Connection

    There is an Equal Tee Configuration right on the discharge line of a Boiler Feed Water Pump. The Tee branch is very close to the pump discharge, less than half a meter. The piping and fitting material is Carbon Steel. Although it is Sch 160 material, there is severe abrasion. I plan to replace...
  11. mufasa1

    Continuous Blow Water Pipe Break at joints while passing through MW ta

    In our boiler plant the temperature of continuous blow water drained by steam drum is near 160 C degrees. We decided to pass this continuous blow water through the Make-up Water Tank via 4" SS pipe. Our objective was to cool down the continuous blow water and send it back to Demi Unit, besides...
  12. mufasa1

    Atmospheric Fuel Oil Tank

    In our boiler plant, there are two fuel-oil ( aboveground, flat bottom )storage tanks. The tanks are around 14m in height and 10m in diameter. We will add an additive to fuel oil. In order to do this we are going to take an 8" branch from the existing line, this line will pass through an...
  13. mufasa1

    Aboveground storage tank piping

    In our boiler plant, there are two fuel-oil ( aboveground, flat bottom )storage tanks. The tanks are around 14m in height and 10m in diameter. We will add an additive to fuel oil. In order to do this we are going to take an 8" branch from the existing line, this line will pass through an...
  14. mufasa1

    Centrifugal Pump Testing

    Next week I will be participating the tests of a centrifugal pump, which my company has ordered, at pump manufacturer's site. What would you expect at this type of test?
  15. mufasa1

    GG-25

    Have you heard about GG-25 valve body material? What is the corresponding ANSI code for this type of material? Is it a DIN code?
  16. mufasa1

    GG-25 Material

    Have you heard about GG-25 valve body material? What is the corresponding ANSI code for this type of material? Is it a DIN code?
  17. mufasa1

    Sea Water Service Pipeline, 316L?

    I am a mechanical engineer at a large petrochemical complex in Turkey. We are located on the seaside and we have decided to feed our fire water pipeline with sea water during an emergency such as lack of fresh water or very low fresh water pressure. In the project the suction line from sea to...
  18. mufasa1

    Sea Water Service Pipeline, 316L?

    I am a mechanical engineer at a large petrocehemical complex in Turkey. We are located on the seaside and we have decided to feed our fire water pipeline with sea water during an emergency such as lack of fresh water or very low fresh water pressure. In the project the suction line from sea to...
  19. mufasa1

    Sea Water Service Pipeline, 316L?

    I am a mechanical engineer at a large petrocehemical complex in Turkey. We are located on the seaside and we have decided to feed our fire water pipeline with sea water during an emergency such as lack of fresh water or very low fresh water pressure. In the project the suction line from sea to...
  20. mufasa1

    Sea Water Service Pipeline, 316L?

    I am a mechanical engineer at a large petrocehemical complex in Turkey. We are located on the seaside and we have decided to feed our fire water pipeline with sea water during an emergency such as lack of fresh water or very low fresh water pressure. In the project the suction line from sea to...