Background:
location: Philadelphia
11 story building-condos
trash chute and recycle chute traverses all 11 floors
three exhaust systems on floors-toilet, dryer and kitchen to a common duct chase up to 3 roof fans.
Owner (and owner's engineer) wants to exhaust the trash / recycle chutes with...
Design parameters:
Grease duct from commerical business (restaurant) on first floor up through building located in Philadelphia, PA.
Using chase with 0" clearance.
Fire wrap requirements proposed by client- O"clearance using a product whichs is 1/2" thick.
I never heard of a product that...
Location; Philadelphia, PA
High rise building-condo units with retail @ 1st floor.
Owner has supply air to the corridors from roof top unit serving floors 2 through 11 discharged at one central location ( at the floor's elevator lobby).
All condos have three types of exhaust; kitchen, toilet...
Job conditions are as follows:
City of Philadelphia, PA
11 story bldg. 6-8 condos per floor.
commercial/ retail space on first floor-drug store and restuarant.
basement-parking garage.
Owner wants the dryer ductwork to exhaust via fire rated chase ductwork up to the roof. Ductwork will be...