I inherited an MS Project 2003 .mpp that needs a total overhaul. I have never done such extensive modifications.
Current:
5 days / week
M - F, 8 hrs /day (0800 - 1200, 1300 - 1700)
Single Shift
Non-Resourced
Needed Conversion:
6 days / week
M - F, 10 hrs / day (0700 - 1200, 1230 - 1730) &...
SETUP:
32 pumps
480V, 16A, 3 ph, 10hp (from vendor, not sure if it makes sense......p = vi sqrt3 = (480V)(16A)(1.73) = 13286.4 VA
13286.4 VA / 746 W/hp = 17.8 hp, right?)
Assuming V & A correct:
(13286.4 VA x 1.25 safety) / pump x 32 pumps = 16608 VA x 32 = 531,456 VA = 532 kVA
Looking at...