Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: stk123
  • Content: Threads
  • Order by date
  1. stk123

    Gas injection wellhead valve open/close sequence

    The gas injection wellhead consists of hydraulically actuated wing valve (WV) followed by surface safety valve (SSV) and sub-surface safety valve (SSSV). We have to define the closing and opening sequence of these wellhead valves. The following sequence was proposed in the design manual: First...
  2. stk123

    Reciprocating & Centrifugal Compressors in parallel

    Have anyone come across a Reciprocating & a centrifugal compressor operating in parallel ? how will be the behaviour of such a system from discharge pressure point of view ? with regards
  3. stk123

    Eductor

    An eductor is used to increase the pressure of a suction gas from 3.5 bara@47°C to 25 bara. The motive gas is at 85 bara@160°C. What will be the discarge temperature of the eductor? How to calculate the discharge temperature ? Is there any way to model an eductor in a steady state HYSYS...

Part and Inventory Search