Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: arango
  • Content: Threads
  • Order by date
  1. arango

    thermal loads for foundation design in 230 kV GIS

    Hello guys, The following table presents the load combinations per node (anchoring point) provided for the design of a 230 kV GIS Node Load Case Fx [kN] Fy [kN] Fz [kN] 01 DEAD LOAD 0,94 0,00 -6,76 01 TEMPERATURE -6,34 -0,14 34,69 02 DEAD LOAD -0,95 0,00 -6,67 02 TEMPERATURE -6,13...
  2. arango

    Proper use/dimensioning of extractor fans for GIS building

    Right now I’m working on projects for different a client that involves the installation of a GIS inside a building; each of them uses have different guidelines for HVAC of the building. Some like to use extractor fans, some have asked for air conditioned (money is no barrier), some doesn’t use...
  3. arango

    Combined disconnectors

    Hello, The picture attached to this message shows a disconnector that combines a semi-pantograph disconnector and a knee-type disconnector, I’ve been searching through the web to find any manufacturer with this equipment among its products list, but so far my search has not been succesful. I...
  4. arango

    Fire walls general requirements

    Greetings, Im' an electrical engineer and I'm not sure if this is the right place to ask this, but i'll do it anyway, I'd like to know if anyone can help me with the necesary requirements for fire walls on buildings, I'd really appreciate it. Thanks.
  5. arango

    IEEE 14 Busbar System

    Hi, I´m currently testing a new Power System Stability software with apparently very good results. From what I´ve researched, the IEEE has a 14 busbar system for this kind of study, I have the diagram of the system but I haven´t found any characteristics of its components yet. Could anybody...
  6. arango

    Transient Simulation with DiGSILENT

    Hi, Does anybody know were I can find a good manual about The transient simulation in DIGSILENT? I ´d really appreciate it Thanks,
  7. arango

    Inrush simulation with ATP

    Hello, I asked to one of the employees of the company to do an Inrush current simulation with ATP of one transformer that is about to be connected, he handed me a model with the saturation curve included. The problem is that when you measure the voltage on the secondary, it appears with...
  8. arango

    ATP BCTRAM model transformer

    Hi everybody, I wouls to know if there is someone who could help me with a simulatuion. I´m trying to recreate the Inrush current in the BCTRAN model of the ATP and I don´t know how to insert the saturation data into this model. I really would appreciate any helpful hint about this. Thank you,

Part and Inventory Search