Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: kalinjm
  • Content: Threads
  • Order by date
  1. kalinjm

    SO2 spike in TGU Incinerator

    After a power blip in early April, we have been experiencing periodic SO2 spikes in our TGU incinerator. The power blip caused the sulfur plant to completely shut down. For the past month they have been happening about once a day. I am hoping for a brainstorming session on to what would be...
  2. kalinjm

    Amine Regenerator vertical thermosyphon reboiler not flowing properly

    We have a thermosyphon reboiler on our amine regenerator that has not been flowing properly since turn around. The bottom sump of the regenerator has a auxiliary baffle and a preferential baffle. In fig 19-37 of the GPSA manual, it is baffle orientation b. We think it might be pluggage, but...
  3. kalinjm

    Amine Regenerator vertical thermosyphon reboiler not flowing properly

    We have a thermosyphon reboiler on our amine regenerator that has not been flowing properly since turn around. The bottom sump of the regenerator has a auxiliary baffle and a preferential baffle. In fig 19-37 of the GPSA manual, it is baffle orientation b. We think it might be pluggage, but...

Part and Inventory Search