  1. RME1

    Proprietary ready-mixed concrete - BS8500

    Does anybody have any experience of using proprietary concretes for structural or non structural purposes? We use CESWI as the basis of our specification, which refers to the standard cement blends (OPC, CEM I, CEM II etc.), typically used in a designed or designated mix. We've been looking...
  2. RME1

    Raft foundation design

    I am looking to design a single story extention (approx 3m x 4.5m) on the back of my house and wanted a bit of guidence from those of you who have done this sort of thing before (preferably in the UK). My background is mainly in bridge design working for large consultants, so typically will have...
  3. RME1

    AASHTO LRFD - Deck Design

    Hi, I'm looking at designing the deck slab for a fairly routine, simply supported, multigirder bridge deck. Being from the UK, I have not used AASHTO before and have a quick question regarding the anaysis. Ordinarily, I would look at the global effects of differential deflection of the beams...
  4. RME1

    UAE design codes

    Does anyone know what brdige design codes are used in the UAE, particularly Abu Dhabi? BS5400, AASHTO, Eurocodes? Thanks
  5. RME1

    BS 5400 part 6

    I've had a request from a fabricator to include some ties between pairs of braced girders as they are concerned about tolerances on straighness which could affect the placing of the permanent formwork panels. They reference table 8 in 5400-6, but I'm having trouble determining the tolerances...
  6. RME1

    Resin fixed reinforcement

    Anyone have any experiance designing resin fixed bars using Hilti HIT-HY-150 system or Hilti HIT-RE-500 system with the Hilti Fastening Technology Manual? I have a few queries if anybody has.
  7. RME1

    Bridges to Buildings

    Has anyone on here made the switch from being a Highway Structures (ie Bridges) Engineer to a Building Structures Engineer? It's something I'm considering at the moment, and wanted to get an idea of the differences between the two and how easy it is to switch. I have about 5 years...
  8. RME1

    Parapet upstand/stringcourse/edge beam

    Hi, I am doing a parapet replacement job in the UK, which involves breaking out the existing edge cantilever and recasting it with more rebar to increase the capacity. On the deck this is not a problem as the new rebar can just be lapped onto the existing bars to tie it into the rest of the...
  9. RME1

    Semi intergral end screen wall

    Hi, I am designing a semi integral bridge in the UK. It is a 2 span bridge (both spans approx 30m), with fixed bearings at the central pier and free bearings at the abutments to allow for expansion. The deck is continuous steel plate girder with a RC deck slab. At the ends of the bridge the...