Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations KootK on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: andi513
  • Content: Threads
  • Order by date
  1. andi513

    Sit Class per IBC 2003

    The 2003 IBC reads that "Site classes A and B, shall not be used if there is more than 10 feet of soil between the rock surface and the bottom of the spread footing or mat foundation." Makes sense so far, but what about deep footings? We have a building with about 80% of the structure supported...

Part and Inventory Search