Background:
According to ASME VIII Div 1 UG-44, ASME B16.5 flanges is acceptable under Division 1 in accordance with requirements of UG-11 .
According to ASME VIII Div 2 AD-711 , ASME B16.5 flanges is acceptable. In accordance with AM-105,1,such flanges and flanged fittings with exception of...
Hi,
I would like to verify if there is a time constraint for fabrication of an pressure vessel after design, and where can I find this. According to me I am only allowed 6 months after a new addendum / code have been issued to design according to the older revision and that I am not allowed to...