  1. drawleigh

    County Criteria 100yr_5day storm

    I have been asked to design a detention pond for the 100 year_ 5 day storm event by the local governing body. Typically the 100 year_24 hour storm is used as the design criteria. I am wondering why this would be requested. It seems to me that the rainfall intensity would be less and thereby...