Hi,
I lead a manufacturing line where most of the operations are hand assembly of electronic boards (big enough components to manage with hand assembly).
The throughput from a line/station is greatly dependent on operator efficiency and how operators perceive the workload. They work fast when...
Can someone please guide me for a high variety and demand mix environment, where cycles times are varying up to 200% with different product variants, how should one go ahead about balancing the lines? Do you take peak cycle times at the stations or consider an average or try to take a mode...