Gentlemen,
During installation of an ACIP, the drill rig being used broke down. The pile was drilled down to the tip elevation, and then the malfunction prevented the installation of grout. The auger was removed without grouting the hole. Is it possible to "re-drill" the open hole, place the...
Gentlemen,
I have the following questions concerning Auger Cast Piles:
1) How does the spacing of the auger flights affect the installation of an ACP? For example, if a spacing of 9” is specified between flights, and a spacing of 12” is used, will the integrity of the pile be affected?
2)...