I have a question on sanitary fixtures, septic tank and leach field sizing
I have an office type building that will be used for 3 shifts; each shift will have 10 occupants.
Also and potentially more critical, there is a conference room in this building that can hold up to 50 occupants, but it...
I have a question on sanitary fixtures, septic tank and leach field sizing
I have an office type building that will be used for 3 shifts; each shift will have 10 occupants.
Also and potentially more critical, there is a conference room in this building that can hold up to 50 occupants, but it...
I am sorry to pose the following basic question. I am not an EE.
I have a general question regarding the efficiency in or cost of starting a power generator cold to full speed/full load. I suspect the efficiency/cost of this can be broken down into fuel, and wear.
Are there any rules of thumb...
I am sorry to post such basic questions, but could someone tell me what is drawn in paper space v. model space and if there is any reason not to drawn in full scale.
Finally, is there a drawing standard out there that spells this out?
Thank you
I have a question regarding the generally accepted practice of calculating forces on a stationary structural element due to water moving past it. Essentially, I have a cantilevered pipe affixed to a stationary block. The pipe will have instruments attached to it. I need to design the pipe and...
I have a question regarding the generally accepted practice of calculating forces on a stationary structural element due to water moving past it. Essentially, I have a cantilevered pipe affixed to a stationary block. The pipe will have instruments attached to it. I need to design the pipe and...