Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: victa1288
  • Content: Threads
  • Order by date
  1. victa1288

    Motor soft starting

    I am running a motor starting by ETAP voltage control module. I set current limiting at 350%FLA and initial voltage setting was set at 55% to ramp to 90%. I was expecting to cause voltage drop on the bus within 15%. But actual voltage drop on the bus was about 30%. I am wondering if I set the...
  2. victa1288

    3 pole or 4 pole breakers

    I am working on 400V system. 4 wire system is required for the incoming section. so the 4 pole circuit breaker is needed for the main incomers. IEC also recommends that 4 pole circuit breakers shpould be used if SWGR or MCC feeds equipment in a hazardous area. But I am not sure about the...
  3. victa1288

    tripping time of Current limiting circuit breakers and fuses

    I am working on International project based on IEC standards. But I don't have data for tripping times of Current limiting circuit breakers and fuses. Some people said it is 1/2 cycle. Other people said it is 1/4 cycle. I would apprecite it if anybody here can provide me more acurate infomation.
  4. victa1288

    paper insulated cable?

    I have a Russian Collegue. He told me that Paper insulated cable is still common in Russa. I got confued by him. To my knowledge, paper insulated cable should be used on higher voltage level. below 10kV, we should use XLPE. is there anybody from Russa?
  5. victa1288

    Difference between Cable tray and cable structure?

    I am currently working in a Russsian project. As per Russian Code PUE. Power cables larger than 3x16mm2 should be with at least 1 diameter spacings in a cable structure. Based on this, there would be a huge amount of cable trays. Some of my collegues are saying that cable tray is same as cable...
  6. victa1288

    run fuses in parrallel?

    I did some study regarding the possibility of using fuse -contactor scheme for 10kV motor. I have noticed that there are no large rating fuses which can suit large motor application. The max. 12kV fuse for motor protection is rated 200A. Apparently it is not good for some larger motors as shown...
  7. victa1288

    cable group factor

    We are working on a russian project. I am trying to find the grouping factor for 1 core cables and 3 core cables. My understanding is that the grouping factor for 1 core cable and 3 core cables are different because of diffenrent structures of cables. We have the goruping factors from a...
  8. victa1288

    power factor correction

    I am wondering if power factor correction has any effect on power stability?
  9. victa1288

    12kV fuse contactor

    I am working on an international project. One of our engineers insists on using 12kV contactor instead of breaker. There are a couple of manufacturers available for 12kV contactor, such as ABB, Siemens, and Areva. I am not feeling comfortable with using 12kV contactors. My concern is as...
  10. victa1288

    temperature rise inside MV SWGR

    Hi, Fellows, I am working on a project on which I have to calculate actual cable ampacity in order to decide overlaod setting of the cable. But I am not sure about the normal temperature rise inside MV SWGR. Does it affect cable ampacity if the cable is run partly inside SWGR? Based on CEC, if...
  11. victa1288

    How to reduce earthing resistance in a rocky area

    We did some testing on the ground rod system in one of our stations. The test results are extremely high. It was 1800 ou with one rod. It was 200 ou with 8 rods and bullding steel structure. I think it is due to a poor design. We are thinking of reducing the soil resistivity by injecting some...
  12. victa1288

    Edit Setpoint group 2

    I have a question regarding SR750. Can we edit Setpoint group 2 on Enervista software?
  13. victa1288

    Arc flash level

    I just started arc flash study recently and I'm not familiar with IEEE1584. Does the catgory have anything to do with relay setting level. In our case, arc flash levels are Cat. 0,1,2. I don't think we should worry about the arc-energy. But I don't know if there are any standards about this...
  14. victa1288

    Calculate transformer inrush current

    I came across a project which I have to deal with a lot existing trnasformers. For those transformers, I have to find out their actual inrush current based on real short circuit capacity of the source. The higher the short circuit capacity, the higher the inrush current. I am wondering if...
  15. victa1288

    Big motor starting

    I want to start a 5000HP motor andthe system is too weak. I thinking of using Auto-tranformer and softstarting methods to start it. But whenever I tried it by ETAP, it always caused the bus Voltage drop to exceed the requirements. Does anybody here have better solution for this system?
  16. victa1288

    Transformer secondary Settings

    I am dealing with a ulitity company. I am doing a coordination settings for a pump station. Utility company is doing their own settings. They insist on using instantanneous settings for SEL587(Secondary of transformer). But their settings would make trip the whole pump station, which is not...
  17. victa1288

    Coordination with Utility settings

    I am doing a coordination study for a ficility. I got a TCC curve from a Utility company.They set their Curve way below our main incomer curve. This a radial distribution sytem. A 5MVA transformer (69kV/4.16kV) is supplying power to a 4160V SWGR, which is a single power source.Secondary cable is...
  18. victa1288

    Motor starting calculation

    I am doing motor startng study. I have two sets of data from motor manufacturer.One is motor circuit data, which is impedance data. The other is motor characteristic data, which is speed-torque curve. ETAP software accepts both. I am wondering which set of data is more accurate for the motor...
  19. victa1288

    Contactor Performance during fault

    Hi,Guys, I am dealing with One medium voltage starter company.I don't want to mention its name. This company chose a fuse-contactor combination and our senior enginner approved it. But later on, after I did short circuit calculation, i realized that fuses can't well protect the contactors...
  20. victa1288

    instanneous settings and short circuit levels

    Hi, I have a tricky question. When we do the realy coordiantion, we always expect the protective device can operate at less than the minimum short circuit, like L-L faul. In my case, I am using an extremely inverse curve to protect against Minimum fault to max. fault, when the fault...

Part and Inventory Search