As contractors, we have installed an emergency generator at a prison facility here in Lexington that is not functioning correctly. The configuration is a wye 12,47Kv primary feed to a 15Kv xfer switch. The xfer switch has two 15Kv C-H breakers in it with Lakefront electronics logic and control...
I have a client who asked us as contractors to do a thermal survey of their hospital panels and transfer switches in the emergency system as a routine maintenance procedure. I know the technology and as a consultant, specified it many times but now as a contractor I have to do the work! I have...