A project contractor has prepared subgrade with 6% lime stabilization, hydrated and mixed according to spec. Proctor tests surpass 98.5 at optimum moisture content. Pavement is 3000 psi plant tested mix with 7" depth using #4 bars on 18' x 30" spacing (local standards for streets). Concrete was...