Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: Canadaian
  • Content: Threads
  • Order by date
  1. Canadaian

    Foundation on mine's rock waste

    An industrial plant location have been chosen by the client. The selceted location is a disposal area of mine's rock waste. The material is heterogenous uncontrolled crushed rock of sand to boulder sizes up to 600mm in diameter. Some of the waste is proceesed product and is "oxidized" which...
  2. Canadaian

    PVD / Obstruction clearance

    Hi As all you may know it is possible to encounter near surface obstruction during installation of Prefabricated Vertical Drains PVD ... I understand that pre augering ( or other method may be chosen by the Contractor) is used to clear the obstruction for a certain depth to facilitate the PVD...
  3. Canadaian

    PVD maximum spacing

    Hi, I am designing an embankment with preloading and PVD installation, we did define the critera at the end of preloading and we have a generous preloading period of 3 years it comes up that drains spacing to be 3 to 3.5 m depending on fill height. Any one have an experience with PVD in such...
  4. Canadaian

    vertical sand drain material

    Hi, A Specification for vertical sand drain says that sand should be placed into holes as: "Sand shall be placed to attain a relative density of 90 %". Is it necessary to define this requirment? How to ensure this requirment is achieved, what test? thanks CD

Part and Inventory Search