  1. ahmadnece

    Transformer rate ?

    if we have 3 generators 400v ,2MVA each and we step up using 3 transformers 400/22kv ,2Mva each can we use 2 step down transformer each 4 MVA if i have maximum load =8MVA or we use 3 or 4 transformers with 2MV. 1-MY question exactly can i design step down transformer its rate is bigger than...
  2. ahmadnece

    waste heat recovery

    i need any recommended specifications for waste heat boiler weigh 15000 kg and above if any links for this issue i will be thankfull .
  3. ahmadnece

    rated current?

    how to calculate bus bar ,cables, switch gear ,circuit breaker rated current?
  4. ahmadnece

    SF6 and vacum breakers

    what is the differnce in costs ,operation and maintenance ?
  5. ahmadnece

    Dry type transformer

    what is the difference between the dry type transformer and the oil type transformer in medium voltage ? which is more economicaly and safty ?if any manuals or links serve this issue i'll be so thankfull
  6. ahmadnece

    meduim voltage power station maintenance ?

    i need any manual for switch gear,cables,cubeicals periodic maintenance ?
  7. ahmadnece

    what is the difference ?

    i'm recently graduated engineer and i want to know what the difference between the following in using ? the switchgear and the circuitbreaker miniture c.b and moulded case c.b sectionlizer and bus coupler sf6 and vacuum c.b and thanks