Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: MMDeacon
  • Content: Threads
  • Order by date
  1. MMDeacon

    Cost of Purchasing

    My management is looking to determine if we have the appropriate number of staff in our Purchasing department or if we have too many. Does anyone have a method/plan/ whatever to determine how much it costs to issue a Purchase Order and cost for other tasks performed by purchasing?
  2. MMDeacon

    Hand Component Placement on PWA's

    Any ideas on how to ensure that components are placed in the right locations on the PWA during hand add-on and soldering operations? I am looking for somthing the add-on operator can use themselves to verify their own work. We are using both through hole and SMT components.
  3. MMDeacon

    Removing Labels from Remanufactured Medical Devices

    Can anyone suggest an effective safe method of removing old labels from the plastic cases of medical electronic devices being remanufactured for reuse. We currently use E-xacto knifes but operators have cut themselves. Chemical label removers need to soak through the label but the labels are...

Part and Inventory Search