I work for a grading and paving company that does curb to curb paving. Recently, on an infrastructure road (3" asphalt over 8" sandy AB, rolled in with a 9 wheel roller in 3 lifts.) I was asked to steel wheel, with vibration, the AB while it was still prety sloppy. I was told not to wory about...