Continue to Site

Eng-Tips is the largest engineering community on the Internet

Intelligent Work Forums for Engineering Professionals

  • Congratulations waross on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Search results for query: *

  • Users: SPND
  • Content: Threads
  • Order by date
  1. SPND

    Supporting short section of undersized tubing

    My apologies for the somewhat vague description but I was having a rough time trying to give a concise description of my delima. I've got a situation wherein I need to join a 316L tube to a machined 304L fitting. The fitting has a lower yield strength than the tube (the tube is slightly work...
  2. SPND

    Minimum coil diameter prior to yield

    I've got a situation where I need to determine the minimum bend radius a tube can take prior to material yield and I am having a heck of a time getting reasonable results. Something tells me this should be a relatively simple exercise but I am not getting any results that make sense. My...
  3. SPND

    Upgrading to latest B&PV Code

    I've recently been hired with a company that uses the B&PVC as a basis for their design reports. The latest version of the code we have is July 1995. Would those experienced with the code here highly recommend upgrading to the latest revision? We manufacture penetration sensors for nuclear...

Part and Inventory Search