As structural engineers, we normally provide the connection forces (moment, shear and axial forces) from a beam for MC connection between a column and a beam. The forces from the column (moment, shear and axial) are not provided. However, as per AISC design guideline 13, the column shear will...
As a professional engineer in Alberta, I signed Schedule B-1 to authority that I will responsible for field review of concrete foundation. However, field review was performed by site engineers. Everything is arranged by the company. Now the construction is complete. I need to sign on Schedule...
I am a structural engineer. I would like to know what should be done for field review as a professional in the concrete construction site. Any special item I should check? Comment and suggestion are appreciated very much. Thank.
I am a structural engineer and need to solve a problem with refused steel pipe pile.
1.This is a group of 8 (2x4) pile foundation. Concrete pedestal is located at pipe pile location. Concrete beams are provided to tie the piles together.
2. The middle pipe pile should be driven to 26m, but...