I am planning to relocate the cooling tower blowdown line of our existing system. I believe that the current installation is not the best industry practice in terms of design and operations as it is connected on top of the pipe instead of the bottom of the pipe. In addition to that, the blowdown...
Hi guys,
I wanted to get some help to check if connecting the cooling tower equalizing line to the supply line (cooling tower outgoing) will have significant effect on the system in terms of flow. The reason for this is that the water treatment vendor suggest that the equalizing line is...