hi
Is it possible in any way for the buyer to specify line pipe dimensions with constant ID and different OD? e.g. pipe of ND 18-inch but with constant ID of 425.2mm and wall thicknesses like 14.5, 16 and 18 mm. I have gone through API 5L (very thoroughly again and again)and all I find is OD...
hi
Is it possible in any way for the buyer to specify line pipe dimensions with constant ID and different OD? e.g. pipe of ND 18-inch but with constant ID of 425.2mm and wall thicknesses like 14.5, 16 and 18 mm. I have gone through API 5L (very thoroughly again and again)and all I find is OD...
Hi
I was wondering if there is any free information source on the internet where I can find the prices for different grades of steels used in pressure vessel industry? Like A516 Gr. 60 & 70, A240 316L, Duplex 2205, Inconel 625 etc.
Any help will be appreciated.
regards
Dear members
What is your opinion regarding the requirement of UG-45 (Min. nozzle neck thickness) calculations for manways?
Are such calculations mandatory even for manways?
Waiting for the replies.
Guys, though you may find the question funny, please give your learned comments.
"Is it possible that a shop may get the renewal of ASME U-stamp accredition without ever having the BPV code?"
Looking forward to the replies
Owais Gillani
I am working on a refinery project where I need to know the efficiency of trays in an existing column.
How to rate these trays? What parameters to look for? What assumptions should I make?
Any help will be appreciated.
Regards
Owais
Hello guys,
I am required to design a 24-inch 300 lb nozzle connection on the top head of a process column for installation of a shell-and-tube HX. The data is as under.
Col. Dia. = 1067mm
Height = 22535mm from ground to top tan line of tower.
Des. Pres.= 400 psig
Des. Temp.= 350 deg F...
Guys,
I have come across a pressure vessel drawing which says:
Stress Relief : YES
PWHT : NO
which seems a bit confusing. Aren't these the same?
Please clarify.
Regards
Owais Gillani
Hello
I am working as Design Engineer for pressure vessels for an overseas assignment. Because of the govt. policies, maximum fabrication has to be done there. I am planning to visit the major fabrication shops for capacity evaluation so that I may redesign some of the vessels according to...